The most important recommendations before, after and during concrete pouring
We must know what are the most important points to be taken care of when pouring concrete, as these points will make the average person stay away from engineers and supervisors in all matters related to concrete in an optimal and required manner.
The most important recommendations to be made before and after concrete pouring
1 - Never allow the pouring of concrete for the foundations until you are sure that all the reinforced bases are clean of any stuck impurities, dust residues or reinforcing wires. The atmosphere is the same and so we must be careful to make sure the bases are cleaned before letting the concrete pour.
2 - Make sure that there is a source of electric current in the event that the electric vibrator is used in the concrete itself, and make sure that there is a backup vibrator that works with gasoline or even electricity, because the vibrator may malfunction during concrete pouring.
3 - Always make sure that there is a source of water or that there is a box with enough water for the requirements of pouring reinforced concrete for the foundations from spraying all carpentry and bases before going down the reinforced concrete and also making sure that there is a chemical that is diluted with water and sprayed on the bases to ensure the cohesion of the reinforced concrete with the concrete of the regular bases existing.
4 - Make sure that there is an electrician for maintenance in order to turn on and off the electricity, and make sure that there are a sufficient number of carpenters during the pouring of reinforced concrete to ensure that the concrete is followed up for the possibility of any defect in the wooden formwork.
5- As for concrete specifications, make sure before pouring reinforced concrete that the concrete itself that is supplied or mixed matches the specifications in terms of cement content, with an emphasis on taking test cubes of concrete during pouring reinforced concrete for the foundations.
6 - Warn the reinforced concrete pouring technician for the foundations not to dismantle any of the columns or move any signal from the columns for any reason, with full assurance that the violation of the commitment will be met with material penalties on the casting contractor, so doing this ensures the accuracy of implementation to reach The best level of quality through the stability of the column bars in their places according to the drawings, which were adhered to in the stages of blacksmithing and carpentry.
7 - Confirm permanently to adhere to the level of pouring reinforced concrete for the foundations in the bases, in order to ensure that there is no shortage in the height of the armed bases, which affects the efficiency of the foundations or even increases the height of the bases, which is considered an excess cost than originally required.
8 - Warn the technicians who follow the process of pouring reinforced concrete for the foundations to clean the iron columns of any cement or concrete materials that occurred during the casting and confirm this early after casting so that the cleanliness of the columns is easier and less expensive.
9 - Emphasis on removing any concrete residues outside the carpentry joints during pouring reinforced concrete, so that the process of dismantling the carpentry is easy and inexpensive and without any losses in carpentry wood.
10 - Emphasis on the necessity of spraying concrete the next morning when concrete is poured, especially before dismantling the carpentry.